Henan Power Grid 100 MW Battery Energy Storage Demonstration Project Completed and Put into Operation
Henan Power Grid 100 MW Battery Energy Storage Demonstration Project Completed and Put into Operation
At 15:38 on December 28, 2018, with the smooth integration of the Lankao Battery Energy Storage Power Station, 16 energy storage power stations of the Henan Power Grid 100 MW Battery Energy Storage Demonstration Project were completed and put into operation. China has taken an important step in the standardization and scale construction of grid-side distributed energy storage power stations.
In 2018, State Grid Henan Power Company cooperated with Pinggao Group Co., Ltd. to select 16 substations in 9 cities including Zhengzhou, Luoyang and Xinyang, adopting “distributed layout, modular design, unitized access, centralized The technical scheme of regulation and control, the construction of distributed grid-level battery energy storage project on the grid side. The construction scale of the project is 100.8 MW / 125.8 MWh, a total of 84 battery containers.
Henan Power Grid is located in the interconnection hub of Central China Power Grid and North China Power Grid and Northwest Power Grid. In recent years, new energy has developed rapidly. The safe operation of power grids, peaking methods and investment construction are facing enormous challenges, and innovative technical means are urgently needed to solve them. As a large-scale energy storage project, Henan Power Grid 100 MW Battery Energy Storage Demonstration Project can provide fast power support for UHV AC-DC faults with millisecond response time, and also enrich the power grid peaking and frequency modulation and air pollution prevention measures. Improve the comprehensive benefits of energy use.
The construction of the 100 MW battery energy storage demonstration project of Henan Power Grid is connected to the grid, marking the breakthrough of the State Grid Henan Power in capturing the power storage technology application and the business model innovation commanding point of the grid, and will transmit and distribute the power system. And the construction of the energy Internet has an important impact. In the next step, the company will strengthen the accumulation of operational data of energy storage demonstration projects, optimize control strategies, deepen fire protection measures and energy storage technology research, improve the reliable operation level of energy storage systems, and strive to build a distributed 100 MW energy storage demonstration application on the grid side. Innovative technology platform.
January 12, 2019