The “One Belt, One Road” iconic project has successfully landed in Brazil!
In September 2017, under the witness
of General Secretary Xi Jinping and the President of Brazil, the Brazilian
Ministry of Mines and Energy issued the project permit to the State Grid
Corporation. The total investment of the Meishan Phase II project is about 9.6
billion reais. The total length of the transmission line is about 2539 km. It
is the longest transmission distance of ±800 kV UHV transmission project in the
world. The State Grid Corporation has a 30-year franchise for the project.
right. The project completed all construction and commissioning work ahead of
schedule on October 16th in Brazil.
The Meishan Phase II project is the
delivery project of the beautiful mountain hydropower station in Brazil's
second largest hydropower station. It is the main channel for the
interconnection of the Brazilian power grid to the north and south. Together
with the Meishan Phase I project, it will transport the clean water and
electricity from the Amazon basin in northern Brazil to the southeast load
center!
The project is a major project of the
State Grid Corporation to serve and promote the “Belt and Road” construction
and successfully landed overseas. The project practices the concept of
“co-industry, co-construction and sharing” and adheres to the localization
operation, achieving mutual benefit and common development of China and
Pakistan. The entire project cycle provides Brazil with a large number of jobs
and taxes for the benefit of local people. At the same time, the project is the
first UHV project independently invested and constructed by China. It has
realized the integration of China's UHV “investment, construction and
operation” and “technology, standards and equipment”. Chain synergy "going
out", driving China's nearly 5 billion yuan of UHV converter transformers,
converter valves and control protection and other domestic high-end electrical
equipment exports.
State Grid adheres to the concept of
sustainable development in Brazil, strictly fulfills its environmental
responsibility and pays attention to the impact of social welfare. The second
phase of the Meishan project is the first large-scale project with zero
environmental penalties in Brazil. It was awarded the “Best Practice Award for
Social Environment Management in Brazil” in 2019, and established the
international brand image of the State Grid Corporation's technology-led and
responsible central enterprises. The safe and high-quality operation of the
Meishan Phase II project effectively solved the problem of clean water and
electricity delivery and consumption in the Amazon basin in northern Brazil. It
strongly supported and served Brazil's economic and social development and contributed
to the Chinese program for Brazil's energy security and stable supply. The
project follows the concept of “co-construction, co-construction and sharing”
and realizes the “going out” of “investment and construction camp”. It is a
landmark project that has taken effect in the construction of the “Belt and Road” in recent years and has become a cooperation
between China and Pakistan in economic and trade fields. A "golden
card" for a win-win situation.
By: JUCRO Electric (Focus on Vacuum Interrupter, Vacuum
circuit breaker, Vacuum contactor , Current/Voltage transformer, SF6 Circuit
Breaker, Isolation Switch and Switchgear)
2019.11.02